WIRE CAM DX Introduction Case Study <Dainichi Seisakusho Co., Ltd.>
Even unskilled workers can become immediately productive! Achieving efficiency in board manufacturing!
We would like to introduce how the introduction of "WIRE CAM DX" has addressed the strong sense of crisis regarding the aging of wiring workers at Daiichi Seisakusho Co., Ltd., which broadly engages in equipment design and system design, centered on the manufacturing of distribution boards, control panels, and sub-distribution boards. ■ Background of Introduction - A strong sense of crisis regarding the aging of wiring workers - Creating a system where anyone can manufacture products with the same quality - Simultaneously aiming for standardization ■ Reasons for Adopting WIRE CAM DX - Adopted WIRE CAM DX, which allows for wiring length measurement not only from ECAD DCX drawings but also from AutoCAD drawings, enabling manufacturing and data linkage. ■ Effects After Introduction - Approximately 15% reduction in overall man-hours from design to manufacturing within about a year and a half after introduction. - Changed to wiring design based on standardized rules by digitizing wiring routes and know-how. - After about six months of training post-implementation, individuals can independently view drawings and perform wiring tasks. - Data linkage to wire processing machines has mechanized manual tasks, reducing work hours and improving quality. - Overall quality level of products has also improved.
- Company:ECADソリューションズ
- Price:Other